RoHS
EU regulation restricting hazardous substances in EEE
PRINCE2
Global methodology for structured project management governance
Quick Verdict
RoHS mandates hazardous substance limits in EEE for EU market access, enforced via testing. PRINCE2 provides voluntary project governance for controlled delivery. Companies adopt RoHS for compliance, PRINCE2 for repeatable success.
RoHS
Directive 2011/65/EU (RoHS 2)
Key Features
- Restricts 10 hazardous substances in homogeneous materials
- Open-scope applies to all EEE unless excluded
- Time-limited exemptions via delegated directives
- Requires technical documentation and EU DoC
- Tiered verification using IEC 62321 testing
PRINCE2
PRINCE2 (Projects IN Controlled Environments)
Key Features
- Seven principles as guiding compliance obligations
- Manage by stages with board decision gates
- Manage by exception using performance tolerances
- Tailoring mandatory for project context and scale
- Product-focused delivery with quality criteria
Detailed Analysis
A comprehensive look at the specific requirements, scope, and impact of each standard.
RoHS Details
What It Is
Directive 2011/65/EU (RoHS 2) is an EU regulation restricting hazardous substances in electrical and electronic equipment (EEE) to mitigate health and environmental risks during waste management. It employs an open-scope approach covering all EEE unless excluded, with limits applied to homogeneous materials (smallest mechanically separable units).
Key Components
- 10 restricted substances (Pb, Hg, Cd, Cr(VI), PBB, PBDE, DEHP, BBP, DBP, DIBP) at 0.1% w/w (Cd at 0.01%).
- Time-limited exemptions in Annexes III/IV, renewed via delegated acts.
- Conformity via technical documentation, EU Declaration of Conformity (DoC), and CE marking.
- Complements WEEE Directive for recyclability.
Why Organizations Use It
- Mandatory for EU market access, avoiding fines, recalls.
- Enhances supply chain governance, ESG reporting.
- Reduces e-waste hazards, ensures level playing field.
- Drives material substitution innovation.
Implementation Overview
- Risk-based: BoM analysis, supplier declarations, IEC 62321 testing.
- Phased governance, documentation retention (10 years).
- Applies to manufacturers/importers of EEE; decentralized enforcement.
PRINCE2 Details
What It Is
PRINCE2 (Projects IN Controlled Environments) is a structured project management methodology and framework. It delivers reliable governance, decision rights, and control for projects of varying scale via a principle-based approach emphasizing value delivery, stages, and exceptions.
Key Components
- **7 PrinciplesGuiding obligations like continued business justification, learn from experience, manage by exception, and tailor to suit.
- **7 PracticesBusiness Case, Organizing, Plans, Quality, Risk, Issues, Progress—applied continuously.
- **7 ProcessesStarting Up a Project to Closing a Project, with stage boundaries.
- **CertificationFoundation (knowledge) and Practitioner (application) levels via PeopleCert.
Why Organizations Use It
- **Strategic benefitsRepeatable governance, reduced overruns, executive efficiency via tolerances.
- **ComplianceAudit trails for regulated sectors like public and healthcare.
- **Risk managementProactive issues, risks, sustainability targets.
- **AdvantagesTailored scalability, hybrid with Agile, improved success rates.
Implementation Overview
- **Phased approachGap analysis, tailoring blueprint, training, pilots, institutionalization.
- **ActivitiesRole definition, templates, certification paths.
- **ApplicabilityAll sizes/industries globally; voluntary with recommended audits.
Key Differences
| Aspect | RoHS | PRINCE2 |
|---|---|---|
| Scope | Hazardous substances in EEE materials | Project governance and lifecycle processes |
| Industry | Electronics manufacturing, global EEE | All sectors, public/private worldwide |
| Nature | Mandatory EU regulation for market access | Voluntary project management method |
| Testing | XRF screening, lab analysis (IEC 62321) | Stage reviews, assurance audits |
| Penalties | Fines, recalls, market bans by states | No penalties, internal governance failure |
Scope
Industry
Nature
Testing
Penalties
Frequently Asked Questions
Common questions about RoHS and PRINCE2
RoHS FAQ
PRINCE2 FAQ
You Might also be Interested in These Articles...

Top 5 Audit Survival Secrets for Your First SOC 2 Type 2: What Auditors Really Check (and How to Pass)
Master your first SOC 2 Type 2 audit with proven strategies: 40-sample testing, vendor gaps, CPA walkthroughs. Get checklists, scripts & tips from SignWell to s

CMMC Level 2 Implementation Guide for Small DIB Contractors: First 5 Steps to C3PAO Certification with Infographic
Actionable CMMC Level 2 guide for small DIB contractors: 5-step roadmap to C3PAO certification with infographic on timelines, costs & POA&Ms. Achieve DoD compli

The Reasons Why NIS2 is Fundamental for Cyber Resilience in Europe
Uncover why NIS2 transcends compliance burdens, delivering real cyber resilience value through enforced measurements and activities. Explore insights via our pa
Run Maturity Assessments with GRADUM
Transform your compliance journey with our AI-powered assessment platform
Assess your organization's maturity across multiple standards and regulations including ISO 27001, DORA, NIS2, NIST, GDPR, and hundreds more. Get actionable insights and track your progress with collaborative, AI-powered evaluations.
Check out these other Gradum.io Standards Comparison Pages
LGPD vs SAMA CSF
Unlock LGPD vs SAMA CSF: Brazil's GDPR-like privacy law meets Saudi finance cyber framework. Key diffs, maturity models, compliance tips for resilient ops. Compare now!
IATF 16949 vs AS9120B
Discover IATF 16949 vs AS9120B: Automotive QMS power vs aerospace distributor precision. Unpack core tools, risk mgmt, traceability diffs. Elevate compliance now!
AS9100 vs IATF 16949
Compare AS9100 vs IATF 16949: Aerospace & automotive QMS standards on ISO 9001. Uncover key differences in risk, safety, config mgmt & suppliers. Boost compliance—discover yours now!