OSHA
US federal regulation for workplace safety standards
PRINCE2
Structured project management methodology for controlled environments
Quick Verdict
OSHA mandates US workplace safety through enforceable standards and inspections, while PRINCE2 provides voluntary project governance via principles, processes, and stages. Companies adopt OSHA for legal compliance and injury prevention; PRINCE2 for controlled, scalable project delivery.
OSHA
Occupational Safety and Health Standards (29 CFR 1910)
Key Features
- General Duty Clause enforces recognized serious hazards
- Hierarchy of controls prioritizes engineering over PPE
- 29 CFR 1910 subparts cover all industry hazards
- Mandatory OSHA 300/300A/301 injury recordkeeping
- Risk-based inspections with civil penalties up to $165k
PRINCE2
PRINCE2 7th Edition (Projects IN Controlled Environments)
Key Features
- Seven principles as guiding obligations
- Seven practices for continuous management
- Seven processes spanning project lifecycle
- Manage by stages and exception tolerances
- Tailoring to suit project context
Detailed Analysis
A comprehensive look at the specific requirements, scope, and impact of each standard.
OSHA Details
What It Is
Occupational Safety and Health Administration (OSHA) standards, codified in 29 CFR 1910, are U.S. federal regulations under the OSH Act of 1970. They mandate safe working conditions, enforced via specific standards and the General Duty Clause. Scope covers general industry hazards; approach is performance-based with hierarchy of controls.
Key Components
- Subparts A-Z addressing surfaces, PPE, toxics, emergencies.
- Part 1904 recordkeeping (Forms 300/300A/301).
- Core principles: hazard prevention, employee training, inspections.
- Compliance via enforcement, no formal certification.
Why Organizations Use It
- Legal obligation avoids penalties up to $165k.
- Reduces injuries, lowers insurance costs.
- Enhances productivity, reputation, ESG alignment.
Implementation Overview
- Gap analysis, written programs (IIPP, HazCom), training.
- Applies to most U.S. private employers.
- Ongoing audits, electronic reporting; state plans may enhance.
PRINCE2 Details
What It Is
PRINCE2 (Projects IN Controlled Environments) is a structured project management framework and methodology. Its primary purpose is to provide reliable governance, control, and value delivery for projects of varying scale and complexity through a principle-based, process-driven approach focused on stages, tolerances, and tailoring.
Key Components
- **Three pillars7 Principles (guiding obligations), 7 Practices (continuous disciplines like Business Case, Risk, Progress), 7 Processes (lifecycle from Starting Up to Closing a Project).
- Built on managed by stages/exception, product focus, and tailoring.
- **Certification modelFoundation (knowledge) and Practitioner (application).
Why Organizations Use It
- Ensures continued business justification and exception-based executive oversight.
- Reduces risks via tolerances, stages, and audit trails.
- Improves success rates through tailoring and lessons learned.
- Builds stakeholder trust in regulated/public sectors; scalable governance.
Implementation Overview
- Phased: gap analysis, tailoring blueprint, training, pilots, rollout.
- Involves role definition, templates, certification paths.
- Applicable to all sizes/industries; voluntary with audits optional.
Key Differences
| Aspect | OSHA | PRINCE2 |
|---|---|---|
| Scope | Workplace safety, health hazards, recordkeeping | Project governance, processes, principles |
| Industry | All US industries, general/construction/agriculture | All sectors worldwide, projects of any size |
| Nature | Mandatory US federal regulation with enforcement | Voluntary project management methodology |
| Testing | Inspections, audits, injury recordkeeping reviews | Stage reviews, exception reports, assurance checks |
| Penalties | Civil fines up to $165k, failure-to-abate daily | No penalties, internal governance failures only |
Scope
Industry
Nature
Testing
Penalties
Frequently Asked Questions
Common questions about OSHA and PRINCE2
OSHA FAQ
PRINCE2 FAQ
You Might also be Interested in These Articles...

5 Ways Modern Compliance Software Makes Evolving Regulations Your Strategic Advantage
Discover 5 ways modern compliance software turns evolving regulations into strategic advantage. Automate monitoring, cut 3x non-compliance costs, stay audit-rea

Breaking Down NIST CSF 2.0 Structure: Core, Tiers, Profiles, and Real-World Application
Master NIST CSF 2.0 structure: Govern + 5 Core functions, Tiers (Partial-Adaptive), Profiles for gaps, and real-world apps. Build effective cyber risk strategie

How to Implement CIS Controls v8.1 as a ‘Control Backbone’ for NIS2 & DORA (Step-by-Step Implementation Guide)
Deploy CIS Controls v8.1 as a control backbone for NIS2 & DORA compliance. Step-by-step roadmap (IG1→IG2), deliverables, metrics & evidence model for hybrid/clo
Run Maturity Assessments with GRADUM
Transform your compliance journey with our AI-powered assessment platform
Assess your organization's maturity across multiple standards and regulations including ISO 27001, DORA, NIS2, NIST, GDPR, and hundreds more. Get actionable insights and track your progress with collaborative, AI-powered evaluations.
Check out these other Gradum.io Standards Comparison Pages
ISO 50001 vs SQF
ISO 50001 vs SQF: Compare energy management & food safety standards. Discover differences, benefits for manufacturers, and implementation to boost efficiency, compliance & resilience now!
ISO 55001 vs J-SOX
Compare ISO 55001 vs J-SOX: Asset mgmt systems meet financial controls. Gain expert insights on compliance, risks, strategy. Optimize your governance—discover key diffs now!
DORA vs PMBOK
Discover DORA vs PMBOK: EU financial resilience regulation meets PMI project mgmt standard. Align compliance, risk & governance for success. Compare now!